Step 3: Site Commissioning

A systematic approach for commissioning

Gateway<br>Installation
1

Gateway
Installation

Gateway onboarding<br>on NMS
2

Gateway onboarding
on NMS

Meter installation as<br>per RF deployment plan
3

Meter installation as
per RF deployment plan

Gateway location<br>iteration, if required
4

Gateway location
iteration, if required

Network<br>Stabilisation
5

Network
Stabilisation

Map tool to monitor installation of DCUs
  • Capability to map latitude and longitude
  • Keep check on installation progress
  • Provides accurate picture of mesh formation on field
Card Image
NMS utilisation for Gateway on-boarding
  • Track communication and mesh formation
  • Evaluate network formation
  • Track network stabilisation
Card Image
G-Net Track Lite
  • Evaluate signal strength
  • Plan data transmission with added antennas as needed
  • Adjust DCU location based on network availability
Card Image