Step 3: Commissioning

A systematic approach for commissioning

Gateway<br>Installation
1

Gateway
Installation

Sensor <br>Installation
2

Sensor
Installation

CT Calibration, <br>if required
3

CT Calibration,
if required

Master creation <br>on application
4

Master creation
on application

Training
5

Training

Data<br>Monitoring
6

Data
Monitoring

Solar String Monitoring Application